Municipality Map
County of Los Angeles
Click here to download printable version of this page (PDF format)
Click on the location of the construction for more detailed information

Median Improvements

 

Roadway Widening

 

Railroad Signal
Improvements

 

Roadway Restriping

 

Traffic Signal Improvements

 

Construction of New Sidewalks

Walnut Grove Ave.

Workman Mill Rd.--

Vineland Ave.

Walnut Grove Ave.

Vineland Ave.

Vineland Ave.

California Ave.

California Ave.

Puente Ave.

Puente Ave.

Puente Ave.

Walnut Grove Ave.

Brea Canyon Rd. (SP)

Brea Canyon Rd. (SP)

-Fairway Dr. (UP)-

Turnbull Canyon Rd.

Sunset Ave.

Puente Ave.

Fairway Dr. (UP)

Fairway Dr. (UP)

California Ave.

Brea Canyon Rd. (SP)

California Ave.

California Ave

Turnbull Canyon Rd.

Turnbull Canyon Rd.

Brea Canyon Rd. (SP)

 

Brea Canyon Rd. (SP)

Brea Canyon Rd. (SP)

Workman Mill Rd.--

 

JUMP START PROJECTS

Jump-Start safety upgrade program improvements at 39 grade crossings along the 35-mile ACE corridor have been completed, “Jump-Start” improvements are designed to increase safety and reduce congestion at these grade crossings. Construction of new medians to prevent motorists from driving around safety gates, construction of new sidewalks, installation of railroad and traffic signal measures, pedestrian safety and road restriping improvements have been completed at all of the ACE project grade crossings in LA County. Construction of safety improvements at Walnut Grove Avenue and Vineland Avenue was completed in July 2001. Construction of safety improvements at Turnbull Canyon Road, Workman Mill Road and Fairway Drive (UP) was completed in October 2002. California Avenue, Brea Canyon Road and Puente Avenue were completed in December 2002.

GRADE SEPARATIONS UNDERWAY IN THE COUNTY OF LOS ANGELES

Construction is completed at the first three out of twenty ACE grade separation projects. Construction is underway or funded at seven more. These major construction projects will depress the roadway or elevate the train tracks to physically separate rail and vehicle traffic at the most heavily congested rail crossings. The County of Los Angeles will construct the Nogales (LA) grade separation project.

NOGALES ST. (LA, LA County-ACE Project Funding Design Only)  Design completed and project management transferred to LA County. 
BREA CANYON RD. (LA) - The project began construction in July 2006 and is estimated to be completed in late summer 2008. The cost is estimated at $65.1 million
SUNSET AVE./ORANGE AVE.
- Construction began in January 2007, estimated to be completed in Summer 2010. The cost is estimated at $76.9 million.

GRADE SEPARATIONS NOT STARTED IN THE COUNTY OF LOS ANGELES

There are three proposed grade separation projects for the County of LA (pending funding approval) at the following locations:

TURNBULL CANYON RD. (UP) - Construction schedule to be determined.
PUENTE AVE. (SP) - Construction schedule to be determined.
FAIRWAY DR. (UP) -Construction schedule to be determined.

 

Copyright: ACE Construction Authority, 2007. All rights reserved.