Ramona Boulevard Grade Separation Fact Sheet
![]() |
|||
![]() |
![]() |
![]() |
![]() |
| PROJECT DESCRIPTION | |
| The Ramona Boulevard Grade Separation Project lowered Ramona Boulevard approximately 26 feet beneath the existing railroad tracks. Two bridges were built to carry railroad traffic over the depressed Ramona Boulevard, which includes pedestrian and motorist safety improvements and walkways with protective railing. The underpass opened to traffic on April 9, 2008. | |
| PROJECT BENEFITS | |
| Construction of the $51.3 million Ramona Boulevard grade separation project began in January 2005. The project: and where passing trains blocked traffic for 13 vehicles/hours per day absorb freight growth and reduce diesel truck traffic blocking the intersection by 2020 |
|