Click here to visit San Gabriel Trench Fact Sheet
Click here to download printable version of this page
(PDF format)
Click on the location of the construction for more detailed information


 

Median Improvements

 

Roadway Widening

 

Railroad Signal
Improvements

 

Traffic Signal Improvements

 

Construction of New Sidewalks

San Gabriel Blvd.

Mission Rd.

San Gabriel Blvd.

Ramona St.

Ramona St.

Mission Rd.

--

Mission Rd.

Mission Rd.

Mission Rd.

Del Mar Ave.

Roadway Restriping

Del Mar Ave.

1--
--
--

San Gabriel Blvd.

Ramona St.

--

Construction of New Roadway

--

Mission Rd.

--
--

Mission Rd.

1-

Del Mar Ave.

1-

1---

1-

JUMP START PROJECTS

Jump-Start safety upgrade program improvements at 39 grade crossings along the 35-mile ACE corridor have been completed. “Jump-Start” improvements are designed to increase safety and reduce congestion at these grade crossings. Construction of new medians to prevent motorists from driving around safety gates, construction of new sidewalks, installation of railroad and traffic signal measures, pedestrian safety and road restriping improvements have been completed at all of the ACE project grade crossings in the City of San Gabriel. Construction of safety improvements at Ramona Street was completed in August 2001. Del Mar Avenue and San Gabriel Boulevard projects were completed in June 2002. Mission Road project was completed in June 2003.

SAN GABRIEL TRENCH PRELIMINARY DESIGN

Design for this project is to be determined. The cost of this design is estimated at $20 million.

RAILROAD LOWERING IN THE CITY OF SAN GABRIEL

Construction is completed at the first three out of twenty ACE grade separation projects. Construction is underway or funded at seven more. These major construction projects will depress the roadway or elevate the train tracks to physically separate rail and vehicle traffic at the most heavily congested rail crossings. The San Gabriel railroad-lowering project involves four streets between Ramona Street and San Gabriel Boulevard. Construction schedule to be determined.
 